M25 LogoM25 Consortium of Academic Libraries
M25 Home arrow Site Map
Imperial College London - Refurbishment update

Imperial College London

The refurbished Level 1 of the Central Library has now been open for almost 8 months - the increased usage by students and the interest from colleagues across the country has been amazing.

Student activity in the building has increased by a third; both in gate entries and circulation of stock. Key statistics for first term and an overview of the project are available in our facts and figures information sheet at

http://www.imperial.ac.uk/library/pdf/press_release_January_2009.pdf

We’ve welcomed colleagues, both nationally and internationally, to the library and are always pleased to discuss the refurbishment, its impact on the service and of course tour the building. An introductory video is available at our homepage at http://www3.imperial.ac.uk/library

If you would like to find out more contact

Angus Brown
Team Leader for Public Services
Central Library
South Kensington Campus
London SW7 2AZ

020 7594 8823

 

Content of M25 e-bulletin Spring 2009 Edition

 

 

This site contains PDF Documents. You can download Adobe Reader free here:

Get Adobe Reader






Lost Password?